Open pit mine survey files build up for years, and most mines keep only the latest one in daily use. On opencast mining surveys, the older surveys are worth more than they seem, because comparing them shows how the pit has changed, as long as the comparison is set up correctly.
Quick Answer
Two dated pit surveys can show a change in geometry. Whether that change was planned extraction, unplanned face movement or material dumped in, the comparison alone cannot say. And it is only valid if both surveys used the same extent and the same reference control. Keep every survey with its date, extent, control and method, and confirm those match before reading any difference.
How one survey should feed a production decision is covered in our article on the quarry survey brief. This article is about using many surveys together.
What an open pit mine survey comparison shows
Comparing two dated surveys of the same pit gives the difference between two surfaces, which is a change in geometry and nothing more until its cause is established.
The difference may be planned extraction: benches mined back to plan. It may be unplanned movement: a face that slumped or a bench crest that failed. It may be material added rather than removed, such as waste dumped into a worked-out area. Or part of it may not be real at all, if the two surveys covered different ground or were tied to different control. The surfaces cannot tell these apart. The people who know the pit, with the mine plan and the production records, can.
| Cause of a difference | What helps identify it |
|---|---|
| Planned extraction | The mine plan and production records |
| Unplanned face movement | Location away from active mining, geotechnical records |
| Material dumped in | Dumping records, rise in surface |
| Change in what was surveyed | Different extent, control or method between dates |
Rule out the survey first
Before reading a difference as movement, confirm both surveys used the same extent and the same control. That takes minutes and removes the most common false alarm.
Key point
A difference between two pit surveys is a change in geometry. Confirm the survey basis matches, then use mine records to explain the cause.
Years of pit surveys and no way to compare them?
Send us a list of what you hold. We will say which can be compared.
Ask us to review the filesBuilding a comparable record
A small amount of discipline with each survey turns a pile of files into a record that can be compared reliably for the life of the mine.
Keep the original ground survey
The survey of original ground before mining started is the base everything else is measured against. If it exists, protect it and record its control. If it does not, the earliest reliable survey becomes the base, and that should be stated.
Record the basis of every survey
For each survey, record the date, the extent captured, the control stations used, the coordinate system and the capture method. Store that with the surface itself, not in a separate email. Our article on the opencast survey handover lists what each handover should state.
Keep the method consistent
A pit is open to the sky, so GNSS and repeat aerial surveys are generally available, though steep highwalls, shadowed floors and overhangs may still need ground methods. Repeat drone flights stay comparable when they use the same control and checkpoints, similar flying height and overlap, and the same processing method. A change of method between dates should be flagged.
Look at the whole series
Lay the surveys out in date order and look at the same area across all of them. A single comparison can mislead. A series shows trends: steady advance where mining is planned, or gradual change in an area where nobody has been mining, which is worth a question. That pattern is often more useful than any single figure.
Bring old surveys onto one basis
Many mines hold surveys from different providers, on different control, sometimes on different coordinate systems. They can often still be used, but each one has to be brought onto a common basis first, and the steps taken should be recorded. Where an old open pit mine survey cannot be tied to the current control with confidence, say so and treat it as indicative rather than comparable. Our article on underground mine coordinates covers the same problem below surface.
Use it before it is needed
The best time to set up a comparable record is before anyone asks a difficult question. When a face moves, a reconciliation is disputed or a new pit design needs the history, a record that is already in order saves weeks of reconstruction.
Where survey cannot help you
A well-kept record makes an open pit mine survey series a strong tool, but some questions sit outside what survey comparison can settle.
Survey cannot say why ground moved; that is a geotechnical question. It cannot recover a survey that was never taken, or fix one whose control was never recorded. And it cannot turn a change in volume into tonnes without a density from sampling, as with volumetric surveys. The SAIMM is a useful reference for mining practice in the region.
Key point
Keep every open pit mine survey with its date, extent, control and method, and compare them as a series.
Need a regular pit survey programme?
Tell us the pit and the reporting cycle. We will price a comparable series.
Get an opencast survey quoteStockpiles on the same site?
See how we keep stockpile figures comparable month to month.