Drawing revisions and site changes
Identify the person authorised to issue construction information. Changes received after setting-out may require a revised visit or new marks; retaining the drawing revision with the record helps the project team identify what each set of references represents.
Where subcontractors work from different files, reconcile the reference systems and drawing versions before transferring positions to site. A design change should be traceable through the survey instruction and handover.

