Underground development survey work keeps the mine plan matched to where the face actually is. On underground mining surveys, the risk is a plan that looks current but was built from measurements that were never re-checked against control.

Quick Answer

Re-tie each measured advance to current survey control, not only to the last recorded face position. Measuring from the last face carries any error forward without a check. Underground sightlines are short, so more stations are generally needed than on surface. Check the control itself back to a known point at intervals, and agree the measuring interval with the mine's survey department.

How control is carried forward through the workings is covered in our article on underground survey control. This article is about measuring the advance and updating the plan.

Why the last face position is not enough

Measuring each advance from the previously recorded face is quick, but it treats the last position as correct, and any error in it is passed into every update that follows.

Suppose a face position was recorded slightly wrong one month. If next month's advance is measured from that recorded position, the new position inherits the error. The month after inherits both. The plan keeps updating, and it looks current, but it drifts further from the real face with each cycle. Nobody notices until something has to line up: a breakthrough, a connection, or a drive approaching a boundary.

Re-tie to control each time

At each measured interval, tie the advance to the survey control rather than to the last face. The control has been established and checked; the last face position has not. Each re-tie is a fresh check, so an error at one advance is caught at the next instead of being carried forward.

What the plan is used for

The plan drives decisions far from the survey office. Planners schedule the next rounds from it. Ventilation and services are extended along it. Geologists plot the ore against it. Contractors are paid on the metres it shows. If the plan has drifted, every one of those decisions inherits the drift. That is why an underground development survey is more than a progress measurement: it is the reference the rest of the mine works from, and it needs the same care as the control it is built on.

Key point

Measure each advance from survey control, not from the last recorded face. That turns every update into a check.

A plan that may have drifted from the face?

Tell us the development and how advances are measured. We will suggest a check.

Ask us to review the method

Running an underground development survey cycle

A short cycle, repeated at each interval, keeps the plan matched to the face and catches errors while they are still small.

Step What it does
Extend control towards the face Keeps a checked reference close to the work
Tie the face position to control Measures the advance from a checked point
Update the plan Shows the face where it really is
Check control back to a known point at intervals Catches drift in the control itself
Record the date, stations and result Lets the next update trace the basis

Plan for short sightlines

Underground, short headings, dust, poor lighting, plant and support all restrict how far an instrument can see. Each setup covers less ground than on surface, so more stations are generally needed over the same distance. Allow for that in the time and access the survey crew is given. Station positions should also be protected from blasting and equipment, so the control near the face is still there and still trustworthy at the next visit.

Agree the interval

Agree the measuring interval with the mine's survey department, tied to the development plan rather than to a fixed calendar. A fast-advancing drive towards a connection needs more frequent checks than a slow one in open ground. Our article on underground survey planning covers fitting survey visits around production.

Check the control too

Control extended deeper into the workings compounds the uncertainty from each earlier station. Check it back to a known point at intervals, and use an independent orientation such as a gyroscopic observation on long drives. Before two headings meet, the checks in our article on the tunnel breakthrough survey apply.

Keep a register

Keep one register of every underground development survey update: the date, the heading, the control stations used, the face position and who measured it. When a question arises months later, the register shows exactly how each position was obtained, and which updates were tied to control and which were not. It also makes handover between survey crews much simpler.

Where survey cannot help you

A disciplined underground development survey cycle keeps the plan honest, but some problems sit outside what survey can fix.

Survey cannot correct development already driven off line; it can only show how far it has departed. It cannot confirm a shaft or portal connection that was never checked, which is why connections on shaft sinking and equipping surveys need their own verification. And it cannot measure ground the crew cannot safely reach. The Mine Health and Safety Council is a useful starting point for the wider framework that governs underground access.

Key point

Tie every advance to control, check the control itself, and record the basis of each plan update.

Need development surveyed on a regular cycle?

Tell us the development plan. We will price the survey programme.

Get an underground survey quote

Plan and face that no longer agree?

An independent check can establish where the face really is.

See survey audits

Let's Build With Accuracy.

Development advances tied to checked control, so the plan matches the face.