Survey handover checklist items are what turn a set of drawings into a result you can rely on, and they are usually the part of the delivery nobody asks for. Before you commission an independent check survey, it is worth knowing what the original surveyor should already have handed over.
Quick Answer
A survey handover checklist has four items that should arrive with any survey, whatever the type: a listing of the control the work was tied to, the check observations that tested the result, a record of the instruments used, and a written statement of what was excluded. Together they show what was checked and what was not. If one is missing, you cannot confirm the result later without measuring again.
The drawings show the answer. The evidence shows how the answer was reached and tested. This article covers the evidence that applies to every survey type. The specific files an aerial job should deliver are covered in our drone survey deliverables checklist.
The four items on a survey handover checklist
Each item below says what it is, and what its absence means for the person who has to rely on the drawings.
1. The control listing
A list of the reference points the survey was tied to, with their coordinates, their source, and the coordinate system they are expressed in.
If it is missing: nobody can repeat the survey on the same reference, and a later survey on different control will disagree for reasons nobody can trace.
2. The check observations
A record of measurements that tested the work rather than produced it. Typically that means closing back onto known control, or measuring to points that were not used to compute the result.
If it is missing: the drawings may be right, but there is nothing to show it. A result that was never tested and a result that passed its test look identical on paper.
3. The instrument records
Which instruments were used, identified by serial number, with the date of their most recent calibration or field check.
If it is missing: a later question about the equipment cannot be answered, and the result cannot be separated from a fault in the instrument that produced it.
4. The statement of exclusions
A short written note of what was not surveyed, what could not be reached, and any assumption made on the day, such as a feature that was obscured or an area without access.
If it is missing: gaps in the survey look like empty ground. A designer or engineer can then treat an unsurveyed area as clear.
Key point
None of the four items is extra work. Each one is produced during the survey anyway. Asking for them costs the surveyor very little, and having them costs you nothing until the day a result is questioned.
Why the evidence matters more than the drawing
A drawing records a result, but only the evidence behind it allows anyone to confirm that result without measuring everything again.
Most survey disputes do not start with an obviously wrong drawing. They start when two sets of figures disagree: a stockpile volume against production records, a contractor's setting out against the client's design, or a new survey against an old one. At that point the question is which figure to trust. With the evidence in hand, a reviewer can usually find the cause from the records. Without it, the only route is to measure again, often after the ground has changed. On volumetric surveys and underground mining surveys alike, that second measurement is rarely of the same ground.
A survey handover checklist does not prevent the disagreement. It shortens it, because the review starts from the records rather than from a second visit to site. That is also why the evidence belongs with the person who relies on the drawings, not only in the surveyor's office files.
Received drawings without the evidence?
Send us what you have. We will tell you which of the four items is missing.
Ask us to review the handoverPut the evidence in the appointment
The easiest time to ask for the evidence is before the survey starts, by naming the four items in the scope of the appointment.
Written into the scope, the survey handover checklist becomes part of what each provider prices, which also makes survey quotations easier to compare. Ask for the evidence to arrive with the drawings, not on request, and name who receives it. In South Africa, the South African Geomatics Council regulates the geomatics profession, and it is reasonable to ask who registered took responsibility for the work.
Key point
Evidence requested in the appointment arrives with the drawings. Evidence requested after a dispute has started may have to be reconstructed, or may no longer exist.
Appointing a surveyor now?
Tell us the job. We will set out the evidence you should receive with it.
Get a survey quoteWhere survey cannot help you
A complete survey handover checklist makes a survey checkable, but it cannot make up for work that was never done.
Evidence cannot show the position of something that was not measured. It cannot recover control that was destroyed before it was recorded. It cannot test an as-built condition once the work has been covered. And it cannot decide, on your behalf, which of two disagreeing results to accept.
What it does is let a qualified reviewer see how the result was reached, and find where two results part company. That is usually the difference between a dispute settled from the records and a dispute settled by measuring everything twice.
Two sets of figures that disagree?
An independent check can usually find the cause from the records first.
See survey auditsLet's Build With Accuracy.
Survey delivered with the evidence that shows how it was checked, so the result can be confirmed without measuring again.
Request a Quote No obligation — we reply within one business day.