Quick Answer

A shaft check report should state four things: which of the three shaft results it checked (orientation, horizontal position, vertical alignment), which method and instruments it used, what was and was not re-observed, and how its method differs from the original survey. A check that repeats the same method can confirm a mistake rather than catch it, so the difference in method must be stated.

How control is carried from surface to the shaft station is covered in our article on shaft survey control. This article is about the report from a second surveyor who checks it.

What a shaft check survey report must state

The report is the only record of what the check established, so it should say plainly what was checked, how, and what was left out, rather than leave the reader to infer it.

Item the report states Why it matters
Which results were checked Orientation, position and plumb are separate results
Method and instruments used Shows whether the check is independent of the original
What was re-observed Separates measured from accepted
What was not re-observed, and why Shows the limits of what the check confirms
How it differs from the original A same-method repeat can repeat the error

Three results, not one

A shaft survey can deliver three separate results: orientation (direction), horizontal position, and vertical alignment, which is how plumb the shaft is. Each comes from a different observation. A report that confirms orientation has said nothing about plumb. Ask the report to name which of the three it covers, one by one.

Measured or accepted

Some values in any check are re-observed, and some are taken from the original survey. Both may be reasonable. The report should separate them, so the reader knows which values the check actually tested and which it carried forward.

Key point

A check report should name which of orientation, position and plumb it checked, and which values it re-observed rather than accepted.

Have a shaft check report that leaves questions?

Send it to us. We will say what it does and does not confirm.

Ask us to read the report

Why the method must differ

Survey control transferred into a shaft should be verified by a different observation or method from the one that established it, because a repeat of the same method can repeat the same error.

If the original transfer used one method and the check uses the same one, with the same possible error source, the two can agree and both be wrong. An independent orientation, such as a gyroscopic observation, checks direction by a different route. The report should state the original method, the check method, and why the check is a genuine test of the original rather than a repeat of it.

Check again as the shaft deepens

Coordinate transfer down a shaft carries forward any error at the collar, and its effect at the working level grows with depth. A check made early in the sink does not cover the levels below it. Plan checks at stages as sinking proceeds, and ask each report to state the depth and stage it applies to.

Who carries out the check

The check is most useful when it is carried out by someone with no stake in the original result, as covered in our article on independent survey verification. The report should say who did the work and how they relate to the original surveyor.

Compare on the same basis

When the original and the check disagree, compare their basis before deciding which is wrong: the date of each survey, the stations used, the coordinate system and the depth or level each one applies to. Shafts change during sinking and equipping, so two results from different stages may both be correct for their own date. A shaft check survey report that states its date, stage and stations makes that comparison quick.

Agree the report format first

Agree the report contents with the checking surveyor when the check is booked, not when the report arrives. A short list in the appointment, matching the table above, means the report answers the questions the mine actually has. It also makes reports from different stages of the sink easy to read side by side, and easy to file with the mine plan records.

Where survey cannot help you

A clear shaft check survey report shows what was confirmed, but some decisions sit outside what any survey report can make.

A check cannot confirm anything it did not re-observe, and it cannot correct steelwork or guides already installed from wrong control; it can only show how far they depart. It cannot set the tolerance the shaft must meet, which comes from the design. Where the shaft walls themselves need recording, 3D laser scanning can capture them without sending a person down. The SAIMM is a useful reference for shaft sinking and mining practice in the region.

Key point

Require every shaft check survey to state its results, its method, its limits and how it differs from the original.

Need a shaft checked independently?

Tell us the shaft, its stage and the original method. We will scope the check.

Get a shaft survey quote

Original and check that disagree?

An independent review can establish the basis of each result.