
Burnstone
7-year project — site infrastructure, vertical & decline shaft, start to handover.

Setting-out, monitoring and as-built survey for civil and structural works — keeping construction on line, on level and on record, on and off the mine.
Construction depends on the survey that puts the design on the ground: setting out foundations, structures, roads and services to the correct position, line and level, then verifying as the work proceeds. Survey House provides this for surface infrastructure on mines and for civil and construction projects generally.
The work spans the full project life — establishing site control, setting out the works from the engineering drawings, monitoring during construction, and capturing accurate as-builts. The group has set out and designed major access roads, so the discipline runs from greenfield earthworks to finished structures.
Where the original design and the as-built must be compared, scanning and conventional survey are combined for a complete quality check. The same rigour applied to shaft steelwork is applied to concrete, structures and earthworks.
Clear answers to the questions clients and search engines ask most about this service.

7-year project — site infrastructure, vertical & decline shaft, start to handover.

Surface infrastructure, decline & 2× vertical shaft surveys.

Vertical shaft equipping & 3D scan of 730 m reamed shaft.

Precision. Accuracy. Trust.